Asbestos air monitoring associated with asbestos removal and remediation was undertaken on the Fawley Power Station site on a daily basis for a duration of four years on behalf of CAPE Plc.
Demolition asbestos survey have also been undertaken of all buildings due to demolished as a consequence of the closure of the plant and the proposed decommissioning and demolition. The demolition asbestos surveys were undertaken over an eight month duration on behalf RWE npower.
Envirochem offered an exhaustive range of asbestos air monitoring services geared specifically to meet the requirements of the project. All analytical work was carried out in accordance with HSE Guidance Note HSG 248 – Asbestos: The analysts’ guide for sampling, analysis and clearance procedures.
Daily activities included but were not limited to the following:
For all buildings within the Fawley Power Station site that are due for demolition as a result of the closure of the plant and proposed decommissioning, demolition asbestos surveys have been undertaken on behalf of RWE npower. The demolition asbestos surveys commenced in June 2013 and were completed over an 8 month period with the final surveys being completed at the beginning of January 2014. The demolition asbestos surveys involved three teams of asbestos surveyors to fulfill the requirements of our client. To allow our client to progress with the decommissioning project, we followed a strict program of works, based on the customer needs. This involved liaising with the client closely as the project commenced and progressed, dividing the buildings into smaller sections to allow survey reports to be issued in a timely manner and formatting and tailoring the reports to the customer needs including the addition of information at their request.
Website Privacy Policy - Privacy Notice
© Envirochem Analytical Laboratories Ltd
Reg. No. 2378228 England